ME10-GN ME15-GNAUTOMATIC GAS WATER BOILEROperation ManualNQ24A 12-2006CONTENTSSpecificationsStart up InstructionsTrouble Shooting GuideParts ListWiri
B) Water Inlet Valve TestTurn power OFF. If the water level rises inside a partially filled tank, theWater Inlet Valve is leaking. Disconnect wire
CECILWARE CORPORATIONREDWHTBLUYELWATER LEVEL CONTROLWATER LEVELPROBESGND6 COMMON4 L-LEVEL5 H-LEVEL3 AC-2N1 FILL2 AC-1LWATERLEDL1NWATER INLETVALVEPOWER
WATER INLET(1/4 " FLARE)16.03.4SIDE ACCESS DOOR(SLIDES UP)OVERFLOWTHERMOMETER4.0"B"14.0 5.0CAUTIONHOT SURFACESME10-GNNP87ATEMPERATURE C
3 ASSEMBLY: The four legs and vent cap drain are packed separately with the water boiler. Install legs by tilting the water boiler on its side and s
4 NOTE: On the first lighting it may be necessary to hold the dial for a longer period to allow trapped air to escape from the line. DIAL SETTINGS A
5 BURNER: The burner is factory set for maximum performance. Should further adjustments be required loosen slotted hex screw on side of venturi and
No. PART # DESCRIPTION ME10-GN ME15-GN1B012AHEYCO BUSHING STRAIGHT, SMALL 1 12B033A TERMINAL BLOCK 3 POSITION 1 13C032S LINE CORD W/ PLUG 120V 15A 1 1
Commentaires sur ces manuels